Henan Rongkai · export manufacturing

Solar PV and LiFePO₄ storageBuilt for serious field deployment

We ship hardware with BOM discipline and paperwork that survives customs, banks, and commissioning—built for teams who install, not skim brochures.

Hero imageHero image. Factory exterior, assembly line with battery packs, or flagship ESS on a neutral background—authentic operations photography

2010

Year established

55+

Countries and regions served

LiFePO₄

Primary storage chemistry

OEM·ODM

Private-label and custom packs

Applicable marks depend on SKU and destination. Official label artwork follows your PO and certificate package—never website thumbnails alone.

Compliance and certification artwork

Tiles below reserve space for official marks and document covers. What you may display in-market is defined by your lab reports and legal artwork; our Trust page explains what professional buyers should verify before wiring money.

CE

Official CE mark artwork (vector or PNG), print-ready

UL

UL-listed mark for applicable battery or system lines

TÜV

TÜV or equivalent certificate logo as issued

IEC

IEC-related conformity mark or certificate badge

UN38.3

Transport test summary reference or label artwork

MSDS

SDS cover or regulatory document strip where no logo applies

Energy storage and hybrid lines

Representative application tracks. Final inverter pairings, enclosure class, and certificates are quoted per destination and duty cycle.

Residential lineResidential line. Wall-mount or stackable home battery in a utility room or garage; clean product context.

Residential ESS

Wall and stack systems for backup, self-consumption, and tariff arbitrage where the grid allows export.

C&I systemsC&I systems. Outdoor ESS cabinet or container on a commercial site; daytime exterior.

C&I battery systems

Outdoor cabinets and container blocks for factories, logistics sites, and campuses with demand-charge pressure.

Hybrid installHybrid install. Roof PV with outdoor inverter and battery; rural or peri-urban setting acceptable.

Weak-grid and hybrid

PV plus hybrid inverter and battery for unstable grids, diesel displacement, and priority-load backup.

OEM brandingOEM branding. Pack with approved label treatment; optional QC bench context.

OEM / ODM packs

Mechanical, electrical, and labeling programs with sample-to-mass workflow and stated MOQ bands.

1 day

Typical first response

Serious inquiries with country, volume, and technical scope usually get a same-business-day direction when time zones align.

2–6 wk

Sample band

Common sample window after agreed drawing freeze; complex tooling or holiday shutdowns extend—your sample PI states the calendar.

4–10 wk

Volume band

Typical production window after deposit and material lock; cell allocation and SKU mix move the date—confirmed on quotation.

Manufacturing discipline

Buyers who tour or witness FAT care about traceability, test records, and pack serialization—not slogans. We align inspection scope and document drop dates before releasing metal.

Factory and productionFactory and production. Pack assembly, aging, or calibrated QC bench—real factory photography preferred over generic stock.

Reference deployments

Headline outcomes are agreed with the customer or installer; your site economics are modeled from your own load and tariff data.

Detailed timelines, single lines, and test excerpts are shared under NDA for qualified RFQs—not full public dossiers.

Nigeria · residential hybridNigeria · residential hybrid. Residential PV plus inverter and battery enclosure; local context if available.

Nigeria · residential hybrid

10 kW PV + 10 kWh storage

Reduced grid and diesel dependence; critical loads supported during outages.

United States · on-grid residentialUnited States · on-grid residential. Suburban roof array; code-compliant mounting visible.

United States · on-grid residential

15 kW PV system

Estimated annual savings in the USD 3,000–4,500 range under the tariff assumptions used at sale.

Mauritius · agricultural hybridMauritius · agricultural hybrid. Greenhouse or farm facility with nearby PV or ESS equipment.

Mauritius · agricultural hybrid

150 kW PV + 60 kWh storage

More predictable around-the-clock supply for controlled-environment farming loads.

Where we shipWhere we ship. Regional project map, shipping lane summary, or three-market photo strip—keep legible labels and avoid decorative clutter.

Frequently Asked Questions

Destination country and discharge port, target certifications, inverter brand and model if known, application (residential, C&I, weak-grid, or OEM), and either annual volume or project size. For batteries, a load list or 15-minute demand profile is more useful than a catalog photo. We reply with a configuration direction and document list; binding commercial terms sit on the formal quotation or contract.
The exact pack depends on SKU, destination, and NDA stage—see our Trust page for a professional checklist. Summaries and artwork we show publicly are indicative only; marks on labels and shipping documents follow the PO you execute. Importer registrations, utility studies, and country-specific filings are typically outside the factory base pack unless quoted.
Sample builds often fall in a 2–6 week window after agreed drawing freeze, while production lots commonly need roughly 4–10 weeks from deposit and material lock—both move with complexity and cell allocation. Your quotation states the band we can commit to; this FAQ is only for rough internal planning.
MOQ is quoted per SKU and design complexity; shallow customization stays modest, deep ODM tooling raises the entry quantity. Standard practice is advance payment plus balance before shipment unless a long-term frame agreement says otherwise, and Incoterms are named explicitly on the PI (EXW, FOB, CIF, etc.). Nothing here replaces the text in your signed order.

View all questions

Plan your next shipment

Send destination, target certificates, inverter preference, and volume. We return a BOM direction, lead-time band, and document checklist appropriate to the risk level.

Solar PV, Inverters & LiFePO₄ Storage | Rongkai Energy