Mobile Solar Tracking System
Consider it for temporary or movable ground installations where standard fixed frames are not ideal.
Product hero: Mobile Solar Tracking System. Tracker structure in field; avoid exaggerated sun rays stock effects. Prefer one consistent aspect ratio across this product line.Representative image only. Final enclosure, terminal layout, labels, sockets, accessories, and color treatment may vary by SKU, revision, and destination market.
Overview
Deployable tracking array for movable or temporary solar setups, promoted with dual-axis control and rapid deployment. Real performance gains depend on latitude, weather, and site layout.
Before you request quotation
This page is meant to help buyers shortlist options, not replace the final datasheet or contract package.
- Confirm the final watt bin, module dimensions, and pallet plan before structural review.
- Use the exact datasheet and flash list revision for tender or engineering submission.
- If the product is portable or tracking-based, request the real deployment scope and accessories.
Highlights
- The old page uses strong marketing language around setup speed and energy gain, so request a real layout, wind rating, and controller spec before quoting
- Tracking benefit depends on irradiance profile, shading, maintenance, and stow strategy, not just headline percentages
- Best sold as an engineered system with trailer, structure, controls, and interface scope clearly defined
Typical applications
- Remote work camps
- Agricultural pumping pre-stages
- Demonstration plants
Specifications
Values below are structured for quoting. Final numbers come from the signed datasheet for your SKU and destination rules.
| Tracking type | GPS-based dual-axis control (per source page) |
|---|---|
| Array size | Engineered per site layout |
| Reference MOQ | 1 unit (confirm after engineering review) |
Integration and services
Provide the target inverter brand, firmware channel, and single-line diagram so we can confirm CAN/RS485 mapping, AC nominal, and protection thresholds before production.
Export crate, pallet pattern, and dangerous-goods paperwork (if required) are quoted per HS code, carrier mode, and destination port.
Documents
Files are delivered after project registration. List below is the standard package to request.
- Product datasheet and electrical/mechanical outline drawing (PDF)
- Installation, commissioning, and safety notice (English; other languages when agreed)
- Warranty statement and RMA process summary for the contract entity
- Commercial invoice, packing list, and HS / country-of-origin declaration (per shipment)
- MSDS and dangerous-goods / transport memo when the SKU ships as regulated goods